Well No. 13, Water Tower, and Iron Filtration Building

Project Description:
Development of a City water well, a 500,000 gallon water tower with an overall tank height of ± 157',  iron filtration building, and related structures/equipment in a 1.43 acre lot zoned residential.  

Location:
30W121 Estes Street

Applicant:
City of Warrenville, Public Works Department 

Project Status:
A formal public hearing for consideration of a Special Use approval in the R-2  Medium-Low Density Single Family Residential District and Planned Unit Development approval to allow the water well, water tower with an overall tank height of ± 157',  iron filtration building, and related structures/equipment was held on August 4, 2022.  

August 4,  2022 meeting transcript (PDF).

Public hearing was continued to September 22, 2022.  Additional information to be posted in response to the questions/comments received at the August 4th meeting.  

Documents:
City Water Well No. 13, Water Tower, and Iron Filtration Building ill Final Subdivision Plat (PDF)

  1. General Application Information Form, 3 pages, prepared by Philip M. Kuchler, dated 7/13/2022
  2. Special Use Permit Application-Form B, 3 pages, prepared by Philip M. Kuchler, dated 7/13/2022
  3. Preliminary/Final Planned Unit Development-Application Form D, 5 pages, prepared by by Philip M. Kuchler, dated 7/13/2022
  4. Property Owner Letter, 1 page, prepared by Kendall Murphy, dated June 29, 2022 and signed on 7/5/2022  
  5. ALTA/NSPS Land Title Survey, 1 page, prepared by Engineering Enterprises, Inc. dated March 22, 2022 
  6. Temporary Use Permit Application, 3 pages, prepared by Philip M. Kuchler, dated July 13, 2022
  7. Offsite Property Use Exhibit, 1 page, prepared by Engineering Enterprises, Inc. dated 7/13/22
  8. Site Plan, 1 sheet, prepared by Engineering Enterprises, Inc. dated June 2022
  9. Landscape Plan, 2 sheets, prepared by Gary R. Weber Associates, Inc., dated 7.12.2022
  10. Building Perspectives, 1 page, Sheet A1-2 of 4, prepared by Allen Pepa
  11. Renderings, 1 page, Sheet A1-3 of 4, prepared by Allen Pepa
  12. Exterior Elevations, 1 page, Sheet A2-1 of 4, prepared by Allen Pepa
  13. Estes Street Water Tower Frequently Asked Questions, dated 8.2.2022